MGM signs PPA with Escape Solar + Storage
MGM Resorts International has signed a 25-year PPA for supply from Estuary Power’s Escape Solar + Storage project in Lincoln County, Nevada.The project, which will feature 115MW of solar combined with a 100MW/400MWh battery storage system, is scheduled to begin operation in early 2026.